Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* Office Move
* Office Moving
* Check on BW Request status
* Check on BW Request status
* Follow-up on HPCC storage status
* Follow-up on HPCC storage status
* UCVM Science review
* UCVM review
* Talked with Fabio about BBP-related issues including
* Talked with Fabio about BBP-related issues including
** Update on Anderson method
** Update on Anderson method
** New Feng's 2013 GMPE's into BBP
** New Feng's 2013 GMPE's into BBP
** New CG GMPE's into BBP
** New CG GMPE's into BBP
** Cumulative Summary Report Implementation
** Tracking "production run" requests


== Today: ==
== Today: ==
Line 23: Line 24:


== Followups: ==
== Followups: ==
* UCVM code review
* NCCS workflow call
* BBP Telecon


== Pending: ==
== Pending: ==

Revision as of 16:46, 3 July 2014

Yesterday:

  • Office Moving
  • Check on BW Request status
  • Follow-up on HPCC storage status
  • UCVM review
  • Talked with Fabio about BBP-related issues including
    • Update on Anderson method
    • New Feng's 2013 GMPE's into BBP
    • New CG GMPE's into BBP
    • Cumulative Summary Report Implementation
    • Tracking "production run" requests

Today:

  • BW Award abstract
  • Confirm details of PEER work plan
  • Geoinfo report (June 15th)
  • SI2 Report (July 15th)
  • NCEE presentation (July 22)
  • Test seism email list
  • Fix issues with Geo email list

Blocked:

  • No

Followups:

  • NCCS workflow call
  • BBP Telecon

Pending:

  • PRAC Final Report (Nov 15)
  • SResponse
  • Post laptop storage table on wiki
  • FW ABF into CME codebase
  • Updated BBP and UCVM required docs to include "known problems" file