Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==


* Removed all hardcoded models, labels, periods, etc
* UCSB code update
* Fixed several issues with new GMPE code
** syn1D updated
** Got bug fix from FW
* Part-C script
** Plotting code scales to how many GMPE models are available
** Python code update
* Tested new BBP workflow
** Matlab code update
** Part-A: Validation runs
* ERI-SS
** Part-B: GMPE verification runs
** BBP NR with UCSB code
* Set up shared folder on Virtual Box
** Windows laptop back from JY
** SCEC VDO working on Windows 7 laptop
** Confirmed MS Office installed on laptop
** Tried SCEC VDO on Mac OS X laptops


== Today ==
== Today ==


* Check with KM, JY status of SCEC VDO setup
* ERI Workshop planning with PM, KM, DG
* Part-C: GMPE plots for BBP runs
* Run Part-C script for CG's simulations
* Write test cases for GMPE code
* UCSB code updates, source
* Update cluster scripts
* Run validation runs for UCSB method


== Blocked: ==
== Blocked: ==
Line 21: Line 24:


== Followups: ==
== Followups: ==
* High-F Call at 11am
* Workshop Call at 11am
* BBP schedule Call at 2:30pm

Revision as of 17:14, 28 August 2014

Yesterday

  • UCSB code update
    • syn1D updated
  • Part-C script
    • Python code update
    • Matlab code update
  • ERI-SS
    • BBP NR with UCSB code
    • Windows laptop back from JY
    • SCEC VDO working on Windows 7 laptop
    • Confirmed MS Office installed on laptop
    • Tried SCEC VDO on Mac OS X laptops

Today

  • ERI Workshop planning with PM, KM, DG
  • Run Part-C script for CG's simulations
  • UCSB code updates, source
  • Run validation runs for UCSB method

Blocked:

  • No

Followups:

  • Workshop Call at 11am