Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Developed script to calculate deterministic MCER results, did spot comparison to check
*Determined cost of 1 Hz run
*Sent Kevin list of sites and locations
*Sent out 1 Hz results, need to investigate results
*Monitored 1 Hz post-processing, completed
*Compared Titan workflow results to reference solution, good match
*Calculated deterministic results for LADT
*Emailed Peter and Nico about deterministic NGA calcs
*Touched base with Phil


== Today ==
== Today ==
*Determine cost of 1 Hz run
*Calculate probabilistic results for all 14 sites with NGA comparisons, post to wiki, notify group
*Send out 1 Hz results
*Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
*Compare Titan workflow results to reference solution
*Add 1 Hz cost to wiki
*Calculate probabilistic results for all 14 sites when 2008 and 2014 scaling factors are added by Kevin
*Consult with Gideon about Titan next steps
*Calculate deterministic results for LADT
*Ask Peter and Nico about deterministic NGA calcs


== Blocked ==
== Blocked ==
Line 16: Line 17:


== Follow-ups ==
== Follow-ups ==
*Phil after check-in
*No


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 18:29, 9 October 2014

Yesterday

  • Determined cost of 1 Hz run
  • Sent out 1 Hz results, need to investigate results
  • Compared Titan workflow results to reference solution, good match
  • Calculated deterministic results for LADT
  • Emailed Peter and Nico about deterministic NGA calcs
  • Touched base with Phil

Today

  • Calculate probabilistic results for all 14 sites with NGA comparisons, post to wiki, notify group
  • Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
  • Add 1 Hz cost to wiki
  • Consult with Gideon about Titan next steps

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration