Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 9: Line 9:
*Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
*Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
*Consult with Gideon about Titan next steps
*Consult with Gideon about Titan next steps
*Integrate RotD50/RotD100 calculation into workflow


== Blocked ==
== Blocked ==

Revision as of 17:22, 10 October 2014

Yesterday

  • Calculated probabilistic results for all 14 sites with NGA comparisons
  • Posted probabilistic results to wiki, emailed to group
  • Added 1 Hz cost to wiki

Today

  • Make SC travel plans
  • Perform deterministic calculation for 14 sites
  • Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
  • Consult with Gideon about Titan next steps
  • Integrate RotD50/RotD100 calculation into workflow

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration