Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Consulted with Gideon about Titan next steps
*Talked with Kevin about CB requests
*Sent out probabilistic results for CyberShake sites
*Create map in SCEC-VDO, sent to CB
*Worked on deterministic calculation
*Sent deterministic results to CB, got positive feedback
*Recalculated 1 Hz SGTs on Titan
*Queued spot test of new 1 Hz SGTs


== Today ==
== Today ==
*Talk with Kevin about CB requests
*Modify map for CB
*Create map in SCEC-VDO
*Do deterministic calculation for other 13 sites
*Try deterministic calculation without including ruptures w/i 0.1 mag points
*Upload deterministic results and email to group
*Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
*Monitor test of 1 Hz SGTs; if successful, queue full post-processing
*Paragraph to Phil about primary accomplishments on Titan in the last 3 months
*Paragraph to Phil about primary accomplishments on Titan in the last 3 months


Line 15: Line 17:


== Follow-ups ==
== Follow-ups ==
*HighF
*No
*CyberShake


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:10, 15 October 2014

Yesterday

  • Talked with Kevin about CB requests
  • Create map in SCEC-VDO, sent to CB
  • Sent deterministic results to CB, got positive feedback
  • Recalculated 1 Hz SGTs on Titan
  • Queued spot test of new 1 Hz SGTs

Today

  • Modify map for CB
  • Do deterministic calculation for other 13 sites
  • Upload deterministic results and email to group
  • Monitor test of 1 Hz SGTs; if successful, queue full post-processing
  • Paragraph to Phil about primary accomplishments on Titan in the last 3 months

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration