Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*BW ticket got closed, emailed Tim to ask about possible CA issue on gridftp hosts
*UGMS meeting
*Updated Titan pilot job to advertise 2 slots
*Submitted 100m, 0.5 Hz test; realized needed to use dt=0.005, resubmitted
*Queued up Titan workflow, skipped SGT transfer to BW
*Integrated RotD code into SeisPSA code


== Today ==
== Today ==
*Monitor Titan workflow
*Read over UCVM paper
*Test SeisPSA code with Rotd option
*Test SeisPSA code with Rotd option
*Read over UCVM paper
*Run full-scale workflow with SeisPSA code with RotD options
*Resume 1 Hz workflow if BW transfer issue resolved


== Blocked ==
== Blocked ==
*No
*Titan down for maintenance today


== Follow-ups ==
== Follow-ups ==
*No
*HighF
*CyberShake
*UCVM


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 18:05, 4 November 2014

Yesterday

  • UGMS meeting
  • Submitted 100m, 0.5 Hz test; realized needed to use dt=0.005, resubmitted

Today

  • Read over UCVM paper
  • Test SeisPSA code with Rotd option
  • Run full-scale workflow with SeisPSA code with RotD options

Blocked

  • Titan down for maintenance today

Follow-ups

  • HighF
  • CyberShake
  • UCVM

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration