Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Summer school mentoring call
*Summer school call
*Monitored 1 Hz wf; found bug, fixed
*Forwarded Rob's responses to Norm
*Responded to Norm, then asked Rob for help
*Continued developing DirectSynth (~45%)
*Continued developing DirectSynth (~25% complete)
*Took another pass at CUG abstract, got feedback from Phil
*UCVM call
*Got login on Titan
*Sent out doodle for CyberShake calls
*Emailed Val to check on status of Titan purge exemptions


== Today ==
== Today ==
*Summer school call
*Integrate Phil's changes into CUG abstract
*Forward Rob's responses to Norm
*Resume PAS 1 Hz run on Blue Waters when system comes back
*Continue developing DirectSynth
*Prepare SBSM 1 Hz post-processing
*Take another pass at CUG abstract
*Continue work on DirectSynth


== Blocked ==
== Blocked ==
*Titan workflows
*Blue Waters downtime extended
*Blue Waters down today


== Follow-ups ==
== Follow-ups ==
*No
*ER-Rest call


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 18:09, 15 January 2015

Yesterday

  • Summer school call
  • Forwarded Rob's responses to Norm
  • Continued developing DirectSynth (~45%)
  • Took another pass at CUG abstract, got feedback from Phil
  • Got login on Titan
  • Emailed Val to check on status of Titan purge exemptions

Today

  • Integrate Phil's changes into CUG abstract
  • Resume PAS 1 Hz run on Blue Waters when system comes back
  • Prepare SBSM 1 Hz post-processing
  • Continue work on DirectSynth

Blocked

  • Blue Waters downtime extended

Follow-ups

  • ER-Rest call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration