Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 2: Line 2:
*Fixed issue with RotD results in PAS 1 Hz workflow, completed
*Fixed issue with RotD results in PAS 1 Hz workflow, completed
*Discovered OLCF blocked access to previous scratch directory, emailed; am waiting for access to be restored
*Discovered OLCF blocked access to previous scratch directory, emailed; am waiting for access to be restored
*Ran small test of changed filtering parameters; more testing needed
*Queued up 2 tests of changing filtering parameters
*Queued up 2 tests of changing filtering parameters
*David generated Vs profiles at UGMS 14 sites
*David generated Vs profiles at UGMS 14 sites

Revision as of 18:08, 3 February 2015

Yesterday

  • Fixed issue with RotD results in PAS 1 Hz workflow, completed
  • Discovered OLCF blocked access to previous scratch directory, emailed; am waiting for access to be restored
  • Ran small test of changed filtering parameters; more testing needed
  • Queued up 2 tests of changing filtering parameters
  • David generated Vs profiles at UGMS 14 sites

Today

  • Requested changes to plots from David
  • Start working on CAAR proposal
  • Continue debugging DirectSynth
  • Send out draft application email to IHPCSS larger committee
  • Email Tom list of CS courses for new grad students, comments on HPC Summer Schools

Blocked

  • No

Follow-ups

  • HighF call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration