Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Replied to Nenad
*Monitored production runs
*Tagged code in SVN
*Fixed runs in error states
*Created monitord database
*Deleted and resubmitted held jobs on Titan
*Started Study 15.4
*Study 15.4 has 144/336 = 43% sites complete
*Found bad Titan proxy issue, regenerated
*Fixed issue with AutoSubmit tool trying to ID number of workflows on each system
*Changed size of DirectSynth jobs (wider, longer) to avoid OOM errors and ensure jobs finish in wallclock time


== Today ==
== Today ==
*Update technical slides with updated workflow hierarchy and walltime estimates
*Monitor production runs
*Check curves during downtime for errors
*Fix runs in error states
*Work on Titan batching of GPU jobs
*Begin calculations of ERF 36 hypocenters on Stampede
*Update list of sites which need fixing
*Respond to Nenad's question
*Respond to Glenn's question


== Blocked ==
== Blocked ==

Revision as of 16:22, 11 May 2015

Yesterday

  • Monitored production runs
  • Fixed runs in error states
  • Deleted and resubmitted held jobs on Titan
  • Study 15.4 has 144/336 = 43% sites complete

Today

  • Monitor production runs
  • Fix runs in error states
  • Begin calculations of ERF 36 hypocenters on Stampede
  • Respond to Nenad's question
  • Respond to Glenn's question

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration