Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==


* Finalized BBP directory structure updates
* Generated high-F plots for new data (May 13)
* Got final OK from JC for the UCSB code and parameters
* Created plots for FAS for both data sets
* Testing pre-RC1 on HPCC
* Contacted RT and KO regarding results
* Got all Unit/Acceptance tests to pass
** New AWP and Hercules results will be generated
* Coordinating with JY about epicenter drives
* Sent e-mail to list with current results
* Worked on BBP examples for First Simulations
* Got laptop and transfer cable from JY


== Today ==
== Today ==


* Finish BBP testing on HPCC
* Migrate data to new laptop
* Update Release Notes
* Generate High-F results for mid and far stations
* Update Mac OS X Installation Guide
* Update BBP virtual image guide
* Work on BBP User's Guide
   
   
== Blocked: ==
== Blocked: ==

Revision as of 14:51, 15 May 2015

Yesterday

  • Generated high-F plots for new data (May 13)
  • Created plots for FAS for both data sets
  • Contacted RT and KO regarding results
    • New AWP and Hercules results will be generated
  • Sent e-mail to list with current results
  • Got laptop and transfer cable from JY

Today

  • Migrate data to new laptop
  • Generate High-F results for mid and far stations
  • Update BBP virtual image guide

Blocked:

  • No

Followups:

  • No