Staff Priorities - Masha: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 3: | Line 3: | ||
=== Yesterday === | === Yesterday === | ||
* CSEP: | * CSEP: | ||
** | ** Tested Japan image | ||
** | ** John found a problem with network settings for miniCSEP image for VirtualBox | ||
** Modified network settings according to John, tested image successfully | |||
** | ** Preparee configuration files for csep-op: Trac ticket #352 Remove RELM R evaluation test from all forecasts groups at SCEC testing center | ||
** Reminded Phil about QF response regarding forecast transfer protocol | |||
=== Today === | === Today === | ||
* CSEP V15.7.0 release candidate: | * CSEP V15.7.0 release candidate: | ||
** | ** Tag official release, build RPMs | ||
* | * NZ testing center: investigate discrepancy in hybrid forecasts for 2012 Canterbery experiment as reported by David R., David submitted a paper about the study | ||
'''Blocked''': No | '''Blocked''': No | ||
'''Followups''': | '''Followups''': | ||
* Remind Phil to follow up with Tom regarding our help for NZTC | * Remind Phil to follow up with Tom regarding our help for NZTC | ||
Revision as of 17:32, 28 July 2015
Current Activities
Yesterday
- CSEP:
- Tested Japan image
- John found a problem with network settings for miniCSEP image for VirtualBox
- Modified network settings according to John, tested image successfully
- Preparee configuration files for csep-op: Trac ticket #352 Remove RELM R evaluation test from all forecasts groups at SCEC testing center
- Reminded Phil about QF response regarding forecast transfer protocol
Today
- CSEP V15.7.0 release candidate:
- Tag official release, build RPMs
- NZ testing center: investigate discrepancy in hybrid forecasts for 2012 Canterbery experiment as reported by David R., David submitted a paper about the study
Blocked: No
Followups:
- Remind Phil to follow up with Tom regarding our help for NZTC
TODO
- Trac ticket #353: Optimize RELM N-test by avoiding event to bin look up when masking bit is set for the whole forecast
- Trac ticket #346: Evaluate Oceanic Transform Faults forecasts since 2012/01/01