Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Monitored production runs
*XSEDE 15
*Fixed runs in error states
*Deleted and resubmitted held jobs on Titan
*Study 15.4 has 144/336 = 43% sites complete


== Today ==
== Today ==
*Monitor production runs
*AGU abstract
*Fix runs in error states
*Go through emails
*Begin calculations of ERF 36 hypocenters on Stampede
*Gather Study 15.4 metrics from Titan logs
*Get together stats on Study 15.4 for Phil's presentation Wednesday
*Gather Study 15.4 metrics from Blue Waters logs
*Respond to Nenad's question
*Gather Study 15.4 metrics from workflow logs
*Respond to Glenn's question
*Start population of Pegasus-statistics DB
*Renew proxy certificate for Titan


== Blocked ==
== Blocked ==
Line 17: Line 15:


== Follow-ups ==
== Follow-ups ==
*No
*HighF call
*Call with Phil?


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:05, 4 August 2015

Yesterday

  • XSEDE 15

Today

  • AGU abstract
  • Go through emails
  • Gather Study 15.4 metrics from Titan logs
  • Gather Study 15.4 metrics from Blue Waters logs
  • Gather Study 15.4 metrics from workflow logs
  • Start population of Pegasus-statistics DB
  • Renew proxy certificate for Titan

Blocked

  • No

Follow-ups

  • HighF call
  • Call with Phil?

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration