Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Submitted AGU abstract
*Ran into seg fault on BBP on BW, Fabio resolved
*Installed BBP on Blue Waters, seg faults on unit tests
*Gathered Study 15.4 metrics from Blue Waters logs
*Renewed OSG certificate for Titan


== Today ==
== Today ==
*Gather Study 15.4 metrics from Titan logs
*Pass unit and acceptance tests in BBP
*Gather Study 15.4 metrics from Blue Waters logs
*Create reference solution for verifying CyberShake BB implementation
*Gather Study 15.4 metrics from workflow logs
*Start integrating new version of BBP HF codes into
*Start population of Pegasus-statistics DB
*Submit SCEC abstract
 
*Check on population of Pegasus-statistics DB
*Email Brian Thomas (earth sci educator, STL science center)


== Blocked ==
== Blocked ==
Line 15: Line 15:


== Follow-ups ==
== Follow-ups ==
*Call with Phil at 1:30
*HighF call


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:11, 11 August 2015

Yesterday

  • Ran into seg fault on BBP on BW, Fabio resolved
  • Gathered Study 15.4 metrics from Blue Waters logs

Today

  • Pass unit and acceptance tests in BBP
  • Create reference solution for verifying CyberShake BB implementation
  • Start integrating new version of BBP HF codes into
  • Submit SCEC abstract
  • Check on population of Pegasus-statistics DB
  • Email Brian Thomas (earth sci educator, STL science center)

Blocked

  • No

Follow-ups

  • HighF call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration