Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Worked on BB CyberShake V&V, got test to pass
*Integrated wcc_siteamp14 into BB CyberShake, passed test
*Met with Brian Thomas at STL sci center
*Resubmitted pegasus-statistics, worked through a few issues with Karan
*Commented on SCEC AM abstract
*DB engine change completed overnight
*Submitted CyberShake AM abstract
*Started code to grab Vs30 from UCVM for high-frequency CyberShake  


== Today ==
== Today ==
*Integrate wcc_siteamp14 into BB CyberShake
*Finish Vs30 code, verify
*Add loop for HF_Synth to work on entire rupture at a time
*Check on pegasus-statistics
*Check on pegasus-statistics
*Consider other options for database engine change
*Add foreign keys to PeakAmps table
*Create wrapper to grab Vs30 from UCVM for high-frequency CyberShake


== Blocked ==
== Blocked ==

Revision as of 17:14, 20 August 2015

Yesterday

  • Integrated wcc_siteamp14 into BB CyberShake, passed test
  • Resubmitted pegasus-statistics, worked through a few issues with Karan
  • DB engine change completed overnight
  • Started code to grab Vs30 from UCVM for high-frequency CyberShake

Today

  • Finish Vs30 code, verify
  • Add loop for HF_Synth to work on entire rupture at a time
  • Check on pegasus-statistics
  • Add foreign keys to PeakAmps table

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration