Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Integrated wcc_siteamp14 into BB CyberShake, passed test
*Finished DAX generator for BB CyberShake
*Resubmitted pegasus-statistics, worked through a few issues with Karan
*Created script to run DAX generator and interface with runs
*DB engine change completed overnight
*Started code to grab Vs30 from UCVM for high-frequency CyberShake


== Today ==
== Today ==
*Finish Vs30 code, verify
*Start testing BB CyberShake workflows
*Add loop for HF_Synth to work on entire rupture at a time
*Determine which metrics are needed for SCEC CyberShake poster and work on them
*Check on pegasus-statistics
*Add foreign keys to PeakAmps table


== Blocked ==
== Blocked ==
*No
*Blue Waters node-hours?


== Follow-ups ==
== Follow-ups ==

Revision as of 18:10, 2 September 2015

Yesterday

  • Finished DAX generator for BB CyberShake
  • Created script to run DAX generator and interface with runs

Today

  • Start testing BB CyberShake workflows
  • Determine which metrics are needed for SCEC CyberShake poster and work on them

Blocked

  • Blue Waters node-hours?

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration