Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Staffed table at the St. Louis Science Center
*BW User call
*Finished modifying workflow to insert and check duration results
*Responded to Rob's question on write/fwrite
*Emailed Rajiv with pegasus-statistics issue


== Today ==
== Today ==
*Look at Rob's question regarding fwrite/write limit
*BW is back, so run PAS broadband CyberShake workflow with duration metrics
*Run PAS broadband CyberShake workflow with duration metrics
*Record on wiki Study 15.4 metrics from pegasus-statistics
*Record on wiki Study 15.4 metrics from pegasus-statistics


Line 11: Line 13:


== Follow-ups ==
== Follow-ups ==
*BW User call
*HighF call


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:05, 20 October 2015

Yesterday

  • BW User call
  • Finished modifying workflow to insert and check duration results
  • Responded to Rob's question on write/fwrite
  • Emailed Rajiv with pegasus-statistics issue

Today

  • BW is back, so run PAS broadband CyberShake workflow with duration metrics
  • Record on wiki Study 15.4 metrics from pegasus-statistics

Blocked

  • No

Follow-ups

  • HighF call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration