Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*BW User call
*Queued PAS broadband CyberShake workflow with duration metrics, error with merging
*Finished modifying workflow to insert and check duration results
*Added Study 15.4 metrics from pegasus-statistics to wiki
*Responded to Rob's question on write/fwrite
*Emailed Rajiv with pegasus-statistics issue


== Today ==
== Today ==
*BW is back, so run PAS broadband CyberShake workflow with duration metrics
*Debug merging error, resume workflow
*Record on wiki Study 15.4 metrics from pegasus-statistics
*Add Study 15.4 metrics from log parsing to wiki
*Add option to turn off low-frequency site response for broadband CyberShake


== Blocked ==
== Blocked ==
Line 13: Line 12:


== Follow-ups ==
== Follow-ups ==
*HighF call
*No


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:05, 21 October 2015

Yesterday

  • Queued PAS broadband CyberShake workflow with duration metrics, error with merging
  • Added Study 15.4 metrics from pegasus-statistics to wiki

Today

  • Debug merging error, resume workflow
  • Add Study 15.4 metrics from log parsing to wiki
  • Add option to turn off low-frequency site response for broadband CyberShake

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration