Staff Priorities - Kevin: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Kmilner (talk | contribs)
No edit summary
Kmilner (talk | contribs)
No edit summary
Line 1: Line 1:
10/16/15
10/23/15


== Yesterday: ==
== Yesterday: ==
* descriptions of MCEr calculations for Rob
* Powell Center Meeting
* provided MCEr results for CB
* helped Glenn Biasi with MeanUCERF3 ERF in OpenSHA apps
* worked through EQ depth issue with Ned in ETAS simulations
* launched new set of simulations on Stampede, final set for Powell Center meeting


== Today: ==
== Today: ==
* post process/generate plots for final powell center meeting ETAS runs.
* Powell center meeting followups
* submit a few more requested runs for Ned, post process when done (likely Saturday evening)
** add cumulative number of earthquakes plots to Operational Aftershock Forecasting app
* write scripts to better track progress of ETAS runs, detect issues
** plot format updates for OAF app
* more MCEr calcs for CB
** new EATS plots: % of runs with at a least one rupture above threshold
* FYI, at USGS Powell Center meeting in Fort Collins next week
* look into ShakeMap calculation request


== Blocked: ==
== Blocked: ==

Revision as of 16:59, 23 October 2015

10/23/15

Yesterday:

  • Powell Center Meeting

Today:

  • Powell center meeting followups
    • add cumulative number of earthquakes plots to Operational Aftershock Forecasting app
    • plot format updates for OAF app
    • new EATS plots: % of runs with at a least one rupture above threshold
  • look into ShakeMap calculation request

Blocked:

no

Followups:

no


Lower priority or longer term tasks

  • Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
  • finish mapping of historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences