Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==


* Created plots for KO, RT, posted results on bbpvault, e-mailed group
* Winter Break
* Contacted SGS regarding results availability
* Updated cluster scripts with SGS method
* NGA-West2 data for Part-B plots
* GMSV call
* BBP call


== Today ==
== Today ==


* Finish and test updated Part-B plotting scripts
* Respond to several e-mails
* Work on data processing script for RT, for High-F group
** software @ scec
* Send High-F call announcement
** JB wants simulations
* Look up table for CG, fill in values
* Call with RG
* AGU poster
** Plot RWG data against other groups
** Verify model obtained from RG with DG
* E-mail from SR with matlab code for GMPEs
** Look into it and implement.. in preparation for workshop
* Create Part-A plots for SGS


== Blocked: ==
== Blocked: ==

Revision as of 18:10, 5 January 2016

Yesterday

  • Winter Break

Today

  • Respond to several e-mails
    • software @ scec
    • JB wants simulations
  • Call with RG
    • Plot RWG data against other groups
    • Verify model obtained from RG with DG
  • E-mail from SR with matlab code for GMPEs
    • Look into it and implement.. in preparation for workshop
  • Create Part-A plots for SGS

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • Try logging into Gordon