Staff Priorities - Masha: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Liukis (talk | contribs)
No edit summary
Liukis (talk | contribs)
No edit summary
Line 7: Line 7:


=== Today ===
=== Today ===
* cseptesting.org is be back to normal, post CSEP meeting minutes
* cseptesting.org is back to normal, post CSEP meeting minutes
* Trac ticket #372: Support Bayesian ensemble models for one-day forecasts
* Trac ticket #372: Support Bayesian ensemble models for one-day forecasts



Revision as of 18:08, 4 March 2016

Current Activities

Yesterday

  • GEOL440 class
  • Trac ticket #372: Support Bayesian ensemble models for one-day forecasts
  • "News" page was broken on cseptesting.org, contacted John

Today

  • cseptesting.org is back to normal, post CSEP meeting minutes
  • Trac ticket #372: Support Bayesian ensemble models for one-day forecasts

Blocked: No

Followups: No

TODO

  • csep-op failure: evaluation was issued on the very first day of new one-year Global forecasts - should not be the case
  • Trac ticket #374: Remove temporary input catalog generated by CA ETASV12_10 model
  • Trac ticket #353: Optimize RELM N-test by avoiding event to bin look up when masking bit is set for the whole forecast

Responsiblities