Staff Priorities - Kevin: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Kmilner (talk | contribs)
No edit summary
Kmilner (talk | contribs)
No edit summary
Line 1: Line 1:
3/30/16
4/5/16


== Yesterday: ==
== Yesterday: ==
* operational aftershock forecasting (OAF) work:
* fixed data file resource issue in OAF application
** plot updates for forecast window: fractiles, mode, mean
* caught Scott up on UGMS & SCEC-VDO call/activities
** added computation of Bayesian combination model of generic and sequence specific models
* began working on synchronization research for SSA talk in 2 weeks
* helped student with OpenSHA/Hazard Spectrum Application questions
** looking at time dependence of multi fault synchronization between SAF Mojave, Coachella, and San Jacinto
* refactored simulator fault element objects in OpenSHA to allow for triangular elements, began triangle implementation
** refactoring of some of my code to allow for time series analysis of recurrence parameters, but some NaNs unresolved


== Today: ==
== Today: ==
* CISM call at 9am
* respond to question on maximum magnitude in OpenSHA GMPE implementations from Arun
* UCERF3-ETAS call at noon
* continue synchronization research
* OAF application work:
** figure out NaNs in recurrence parameter time series analysis
** make b-value calculation optional, default to generic parameters b-value for bayesian model
* follow-up with Ned on OAF application
* RSQSim/OpenSHA work
** fixes for case with no aftershocks
** continue triangle implementation:
** possibly adding in CA-specific generic aftershock parameters
*** triangular fault surface implementation and SCEC-VDO support
* meet with Sanskriti on SCEC-VDO scripting capabilities
*** loading of triangular elements from barall file format
* begin CyberShake MCEr calculations for additional sites, find run IDs
** if I get an SRF file from Keith, view in SCEC-VDO and compare with CyberShake rupture variations
* site amplification work
** waiting on documentation requests/feedback


== Blocked: ==
== Blocked: ==

Revision as of 21:20, 5 April 2016

4/5/16

Yesterday:

  • fixed data file resource issue in OAF application
  • caught Scott up on UGMS & SCEC-VDO call/activities
  • began working on synchronization research for SSA talk in 2 weeks
    • looking at time dependence of multi fault synchronization between SAF Mojave, Coachella, and San Jacinto
    • refactoring of some of my code to allow for time series analysis of recurrence parameters, but some NaNs unresolved

Today:

  • respond to question on maximum magnitude in OpenSHA GMPE implementations from Arun
  • continue synchronization research
    • figure out NaNs in recurrence parameter time series analysis
  • follow-up with Ned on OAF application
    • fixes for case with no aftershocks
    • possibly adding in CA-specific generic aftershock parameters
  • meet with Sanskriti on SCEC-VDO scripting capabilities
  • begin CyberShake MCEr calculations for additional sites, find run IDs

Blocked:

no

Followups:

no

Lower priority or longer term tasks

  • once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3
  • wiki page for web services