Staff Priorities - Masha: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Liukis (talk | contribs)
No edit summary
Liukis (talk | contribs)
No edit summary
Line 2: Line 2:


=== Yesterday ===
=== Yesterday ===
* Problems updating CSEP web sites with new release information, sent email to John
* Posted miniCSEP archive on CSEP Trac, updated information on miniCSEP
* CSEP status call at noon
* Looking at CSEP code to implement Danijel’s index look up for RELM optimization
* Sent GEAR1 results to the SSA poster group
=== Today ===
* 8am meeting about CSEP poster for SSA
* 8am meeting about CSEP poster for SSA
* Distributed more data for the SSA poster, wrote a script to strip numerical extensions from results files and sent to the group
* Distributed more data for the SSA poster, wrote a script to strip numerical extensions from results files and sent to the group
* Asked John to build miniCSEP image with V16.4.0 for testing, test miniCSEP once available
* John posted miniCSEP image with V16.4.0, tested successfully
* SSA poster
* SSA poster
* GEOL440 class
* GEOL440 class
* Code changes to implement Danijel’s index look up for RELM optimization
=== Today ===
* Still waiting for csep-op to be idle to install V16.4.0 release - most likely today since most of beginning of the month processing completed
* SSA poster
* Post CSEP meeting minutes


'''Blocked''': No
'''Blocked''': No

Revision as of 17:14, 8 April 2016

Current Activities

Yesterday

  • 8am meeting about CSEP poster for SSA
  • Distributed more data for the SSA poster, wrote a script to strip numerical extensions from results files and sent to the group
  • John posted miniCSEP image with V16.4.0, tested successfully
  • SSA poster
  • GEOL440 class
  • Code changes to implement Danijel’s index look up for RELM optimization

Today

  • Still waiting for csep-op to be idle to install V16.4.0 release - most likely today since most of beginning of the month processing completed
  • SSA poster
  • Post CSEP meeting minutes

Blocked: No

Followups: No

TODO

  • csep-op failure: evaluation was issued on the very first day of new one-year Global forecasts - should not be the case
  • Trac ticket #353: Optimize RELM N-test by avoiding event to bin look up when masking bit is set for the whole forecast

Responsiblities