Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Monitored Study 15.12 - 5 sites left
*Monitored Study 15.12: 4 sites left
*Reran AWP GPU forward sim with skip of 2 so divisibility works
*Fixed issue with Study 15.12 seismogram
*Created movie from AWP GPU forward sim results, aborted after 930 of 2150 timesteps
*Created AWP GPU movie, sent out - identified issue with SRF
*Queued 3 SGT workflows on Titan
*Titan SGT runs completed successfully
*Identified Northridge candidates for C.B.


== Today ==
== Today ==
*Finish creating AWP GPU movie
*Transfer Titan SGTs to Blue Waters
*Fix issue with seismogram in one of the Study 15.12 sites
*Regenerate missing ruptures
*If hear back from Rob, work on comparing Northridge events to historical
*Run Study 15.12 on 4 remaining sites
*Monitor Titan SGT runs
*If hear back from Rob or Christine, work on comparing Northridge events to historical
*May hear back from Rob on SRF issues: if so, implement fix, rerun fwd sim, regenerate movie


== Blocked ==
== Blocked ==
Line 16: Line 16:


== Follow-ups ==
== Follow-ups ==
*No CyberShake call today
*High-F call


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:08, 25 April 2016

Yesterday

  • Monitored Study 15.12: 4 sites left
  • Fixed issue with Study 15.12 seismogram
  • Created AWP GPU movie, sent out - identified issue with SRF
  • Titan SGT runs completed successfully

Today

  • Transfer Titan SGTs to Blue Waters
  • Regenerate missing ruptures
  • Run Study 15.12 on 4 remaining sites
  • If hear back from Rob or Christine, work on comparing Northridge events to historical
  • May hear back from Rob on SRF issues: if so, implement fix, rerun fwd sim, regenerate movie

Blocked

  • No

Follow-ups

  • High-F call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration