Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Regenerated missing ruptures
*Finished Study 15.12
*1 more Study 15.12 site done: 3 to go
*Worked on overlaying CA trace on movies
*Populated Moment DB with missing tables
*Sent seismogram data to C.B.
*Rob's SRF looks different; not sure why


== Today ==
== Today ==
*Continue work on Study 15.12
*Try installing BBP on Blue Waters
*Investigate SRF problem with Rob
*Continue working on overlaying CA trace
*CyberShake writeup to Christine with figure/images; pull out caption
*Waveforms for the 1 site x 3 realizations that are Northridge-like
*Overlay CA trace on fwd sim movie
*Change moment DB so all tables are MyISAM
*Upload Study 15.12 maps to wiki
*Upload Study 15.12 maps to wiki
*Send out Doodle for intern meeting
*Send out Doodle for intern meeting
*Plan meeting to discuss DB approach
*Plan meeting to discuss DB approach
*Change moment DB so all tables are MyISAM


== Blocked ==
== Blocked ==
Line 20: Line 16:


== Follow-ups ==
== Follow-ups ==
*No
*High-F


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:07, 2 May 2016

Yesterday

  • Finished Study 15.12
  • Worked on overlaying CA trace on movies
  • Sent seismogram data to C.B.

Today

  • Try installing BBP on Blue Waters
  • Continue working on overlaying CA trace
  • Upload Study 15.12 maps to wiki
  • Send out Doodle for intern meeting
  • Plan meeting to discuss DB approach
  • Change moment DB so all tables are MyISAM

Blocked

  • No

Follow-ups

  • High-F

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration