Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==


* Back from PyCon
* BBP call
* Receipts
** Multi-plane SRF plan
* Check mesh extraction job on Blue Waters
* Posted Irikura results from AP code
* Meeting with JY regarding counting downloads on hypocenter
** Sent bug report to AP
** Received new version of code
** Ran again all simulations on HPCC
** Still bugs, sent new report
* Talked to CG regarding High-F processing
** Able to run the test from RT/SA
** Got identical GMT plot, but different time series plots
** Sent report to RT/AS


== Today ==
== Today ==


* Review AP revised Irikura code
* Work on High-F
* Integrate Irikura rupture generator on BBP
** Refactor processing code
* Run tests to make sure we can reproduce AP's results
** Run plot scripts with 3-stations used in High-F
* Run few SO CAL events on BBP server to validate code
** Hercules vs observations
* Wait for new Irikura rupture generator code from AP


== Blocked: ==
== Blocked: ==
Line 19: Line 27:
== Followups: ==
== Followups: ==


* Allocation call @11am
* No


== To Do: ==
== To Do: ==

Revision as of 17:09, 20 June 2016

Yesterday

  • BBP call
    • Multi-plane SRF plan
  • Posted Irikura results from AP code
    • Sent bug report to AP
    • Received new version of code
    • Ran again all simulations on HPCC
    • Still bugs, sent new report
  • Talked to CG regarding High-F processing
    • Able to run the test from RT/SA
    • Got identical GMT plot, but different time series plots
    • Sent report to RT/AS

Today

  • Work on High-F
    • Refactor processing code
    • Run plot scripts with 3-stations used in High-F
    • Hercules vs observations
  • Wait for new Irikura rupture generator code from AP

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Remove GMT dependencies and files
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon