Staff Priorities - Masha: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Liukis (talk | contribs)
No edit summary
Liukis (talk | contribs)
No edit summary
Line 2: Line 2:


=== Yesterday ===
=== Yesterday ===
* Posted data per Alvaro G. request
On vacation
* Installed ETASSYN_DR model for NZ, added acceptance test for the model
** Created input catalog for the test on NZ image


=== Today ===
=== Today ===
* csep-op: reprocess SW Pacific 1-day forecast group
* csep-cert one-day-models-V16.7 forecast group:
* csep-cert one-day-models-V16.7 forecast group:
** Add "regular" RELM tests
** Add "regular" RELM tests
* Test ETASSYN_DR model for NZ
** Change publishing server
* Plot for Bayesian Posterior weights
* Investigate "out of memory" failure for NZ ETASSYN_DR model
* CSEP status call at noon
* Contacted Max regarding reference data for new evaluation tests and Bayesian posterior weights plot
* Collect raw catalogs for the last day of each testing region per Alvaro G.'s request
* Alvaro G.'s request:
** Reprocess to generate missing forecasts
** Collect raw catalogs for the last day of each testing region per  


'''Blocked''': No
'''Blocked''': No

Revision as of 21:18, 5 July 2016

Current Activities

Yesterday

On vacation

Today

  • csep-cert one-day-models-V16.7 forecast group:
    • Add "regular" RELM tests
    • Change publishing server
  • Investigate "out of memory" failure for NZ ETASSYN_DR model
  • Contacted Max regarding reference data for new evaluation tests and Bayesian posterior weights plot
  • Alvaro G.'s request:
    • Reprocess to generate missing forecasts
    • Collect raw catalogs for the last day of each testing region per

Blocked: No

Followups: No

Responsiblities