Product Backlog - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 3: Line 3:
== Project/Product Backlog ==
== Project/Product Backlog ==
* Schedule CXM Call (Wed 4pm)
* Schedule CXM Call (Wed 4pm)
* Test UCVMC CS173 test points
* Ask Andreas about mesh format (prefer 3 files)
* Ask Andreas about mesh format (prefer 3 files)
* Check with Scott on UCVMC problems (and fix)
* Check with Scott on UCVMC problems (and fix)
* Prepare ECCS request for CyberShake
* Prepare ECCS request for CyberShake
* Test UCVMC CS173 test points
* 11NCEE revision requests mailed out
*11NCEE revision requests mailed out


== Related Entries ==
== Related Entries ==
*[[CME Software Staff]]
*[[CME Software Staff]]
*[[CME Project]]
*[[CME Project]]

Revision as of 20:21, 5 March 2018

Philip Maechling's Product Backlog

Project/Product Backlog

  • Schedule CXM Call (Wed 4pm)
  • Test UCVMC CS173 test points
  • Ask Andreas about mesh format (prefer 3 files)
  • Check with Scott on UCVMC problems (and fix)
  • Prepare ECCS request for CyberShake
  • 11NCEE revision requests mailed out

Related Entries