Fall 2011 Production Run Curves: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
|||
| Line 3: | Line 3: | ||
== New Precarious Rock Sites == | == New Precarious Rock Sites == | ||
=== CVM-H 11.2 === | === CVM-H 11.2 === | ||
{| border=1 padding=2 | |||
! Site !! Run ID !! 1 sec SA !! 0.5 sec SA || 0.2 sec SA || 0.1 sec SA | |||
|- | |||
| | |||
|} | |||
=== CVM-S4 === | === CVM-S4 === | ||
Revision as of 22:47, 22 September 2011
These are hazard curves produced from the Fall 2011 production run.
New Precarious Rock Sites
CVM-H 11.2
| Site | Run ID | 1 sec SA | 0.5 sec SA | 0.2 sec SA | 0.1 sec SA |
|---|---|---|---|---|---|