Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Added ticket for CVM-H basin depth in ARs
*Emailed halfspace seismograms to group
*Check source description in forward run
*Finished JBSim3d refactoring
*Started refactoring JBSim3d
*Extracted new forward AWP seismograms, still quite different
*Synthesized halfspace run seismograms - Z looks good
*Got ideas from Kim on things to try
*Fixed issue with extended source in AWP, check seismograms again
*Sent Rob simulation params to possibly do FK run
*Set up another Z run with TEST site


== Today ==
== Today ==
*Email halfspace seismograms to group
*Test refactored JBSim3d
*Finish JBSim3d refactoring
*Create workflow to run both SGTs and PP
*Create workflow to run both SGTs and PP
*Add merged PSA calculation option to JBSim3d
*Add merged PSA calculation option to JBSim3d
*Extract new forward AWP seismograms
*Try Kim's suggestions for investigating halfspace differences


== Blocked ==
== Blocked ==
Line 18: Line 16:


== Follow-ups ==
== Follow-ups ==
*CyberShake calls
*With Phil re: storage
*With Phil re: storage



Revision as of 17:07, 9 May 2012

Yesterday

  • Emailed halfspace seismograms to group
  • Finished JBSim3d refactoring
  • Extracted new forward AWP seismograms, still quite different
  • Got ideas from Kim on things to try
  • Sent Rob simulation params to possibly do FK run

Today

  • Test refactored JBSim3d
  • Create workflow to run both SGTs and PP
  • Add merged PSA calculation option to JBSim3d
  • Try Kim's suggestions for investigating halfspace differences

Blocked

  • No

Follow-ups

  • CyberShake calls
  • With Phil re: storage

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration