Staff Priorities - Scott: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
* | *Checked JBSim3d hazard curves - look good | ||
*Calculated reciprocity seismograms from Kim's suggestions and scaling test - nothing conclusive | |||
*Kim | *Queued run to repeat results from 1/27/12 run (high-speed VM, 0D, high Q) without scaling issue | ||
* | *Added merged PSA calculation option to JBSim3d | ||
== Today == | == Today == | ||
* | *Earthcube questionnaire | ||
* | *Synthesis seismograms from repeated 1/27/12 run - verify no scaling issues | ||
*Forward run with halfspace and extended source | *Forward run with halfspace and extended source | ||
*Forward run with 3D and point source | *Forward run with 3D and point source | ||
* | *Test JBSim3d_PSA | ||
== Blocked == | == Blocked == | ||
Revision as of 17:03, 14 May 2012
Yesterday
- Checked JBSim3d hazard curves - look good
- Calculated reciprocity seismograms from Kim's suggestions and scaling test - nothing conclusive
- Queued run to repeat results from 1/27/12 run (high-speed VM, 0D, high Q) without scaling issue
- Added merged PSA calculation option to JBSim3d
Today
- Earthcube questionnaire
- Synthesis seismograms from repeated 1/27/12 run - verify no scaling issues
- Forward run with halfspace and extended source
- Forward run with 3D and point source
- Test JBSim3d_PSA
Blocked
- No
Follow-ups
- No
Areas of Responsibilities
- CyberShake 1.4
- Broadband CyberShake
- Code migration