Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* 11.2.3 validation tests are complete now
* Setup new laptop
* Final touches on the validation test script
* Ran tests for URS(3d)/SDSU/SDSU with and without site response
* Compared 11.2.3 and trunk (using Loma Prieta/URS)
* Talked to Phil regarding Broadband development, priorities
** Compared several files (output looks identical)
* Python code reworking
** Missing ps files (changed validation script to deal with that)
** Missing xml file in outdata directory (changed run_bbp_2g to copy it)
* Fixed Trak#73 (wrong units in acc bbp file header)


== Today: ==
== Today: ==
* Go through Trak issues with Phil and prioritize development
* Continue investigating differences in SDSU validation tests
* Setup new laptop
* Study Broadband distribution layout, content in GF directories
* Start running first Fling Study scenario (101) on HPCC
* Get ready to run Fling Study scenarios on HPCC when Phil's run ends


== Blocked: ==
== Blocked: ==
Line 17: Line 14:


== Followups: ==
== Followups: ==
* Meeting with Phil after standup call to discuss priorities
* No

Revision as of 17:06, 22 May 2012

Yesterday:

  • Setup new laptop
  • Ran tests for URS(3d)/SDSU/SDSU with and without site response
  • Talked to Phil regarding Broadband development, priorities
  • Python code reworking

Today:

  • Continue investigating differences in SDSU validation tests
  • Study Broadband distribution layout, content in GF directories
  • Get ready to run Fling Study scenarios on HPCC when Phil's run ends

Blocked:

  • No

Followups:

  • No