== Yesterday: ==
== Yesterday: ==
* Call with Ronnie and Katie about Fling Study
** Ronnie will make changes to station lists, then we are good to go
* Reproduced Rumi's results using 11.2.3 and her scenarios
** Results do not look good when using URS codebase for LF
* Initial analysis of space and time requirements for running Fling Study
** Short summary: 1.7Tb and about 3 months using only HPCC :-(!
== Today: ==


* Organize Fling Study information on the wiki, create progress tables
* Organize Fling Study information on the wiki, create progress table
** Trac #95 (wiki updating)
** Trac #95 (wiki updating)
* Test HPCC setup with Fling Study scenario 101 and compare result to Phil's run
* Test HPCC setup with Fling Study scenario 101 and compare result to Phil's run
* Meet with Phil and John Yu wrt Fling Study strategy
** Results look good
* Ran Fling Study scenario 103 (HPCC)
* Met with Phil and John Yu wrt Fling Study strategy
 
== Today: ==
 
* Validate Fling Study scenario 103
* Continue executing Fling scenarios
* Meet John Yu to coordinate data storage, scenario running
* Create Fling Data repo on scec-00 or scec-01
** Move data from Phil's, John's, and Fabio's directories
* Make trunk work both with and without site response
* Make trunk work both with and without site response
== Blocked: ==
* No
== Followups: ==
* Meeting with John Yu @ TBD


== Ongoing: ==  
== Ongoing: ==  
Line 19: Line 27:
** First candidate is removing the plot directory from the GF directory
** First candidate is removing the plot directory from the GF directory
** Create separate validation package
** Create separate validation package
** Separate events and codebases from each other  
** Separate events and codebases from each other
 
== Blocked: ==
* No
 
== Followups: ==
* Meeting with John Yu and Phil @ TBD

Revision as of 17:05, 29 May 2012

Yesterday:

  • Organize Fling Study information on the wiki, create progress table
    • Trac #95 (wiki updating)
  • Test HPCC setup with Fling Study scenario 101 and compare result to Phil's run
    • Results look good
  • Ran Fling Study scenario 103 (HPCC)
  • Met with Phil and John Yu wrt Fling Study strategy

Today:

  • Validate Fling Study scenario 103
  • Continue executing Fling scenarios
  • Meet John Yu to coordinate data storage, scenario running
  • Create Fling Data repo on scec-00 or scec-01
    • Move data from Phil's, John's, and Fabio's directories
  • Make trunk work both with and without site response

Blocked:

  • No

Followups:

  • Meeting with John Yu @ TBD

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other