Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 20: Line 20:


== Followups: ==
== Followups: ==
* No
* Ronnie to get permissions fixed


== Ongoing: ==  
== Ongoing: ==  

Revision as of 17:25, 30 May 2012

Yesterday:

  • Validated Fling Study scenario 103
  • Started Fling scenario 104
  • Met John Yu to coordinate data storage, scenario running
  • Created Fling Data repo on scec-01, under /home/scec-01/projects/bbp
    • Moved data from Phil's directories
  • Updated wiki tables

Today:

  • Continue to schedule Fling scenarios
    • Coordinate with John Yu to run high priority scenarios first
  • Validate John's scenarios, move his data to Fling repo
  • Look at plot directory in GF distribution
  • Make trunk work both with and without site response

Blocked:

  • No

Followups:

  • Ronnie to get permissions fixed

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other