Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
Fsilva (talk | contribs)
No edit summary
Line 2: Line 2:


* Fling Study
* Fling Study
** Finished running Scenarios 113, 114, 115 (weekend), started 116
** Monitoring Scenario 116 on HPCC
** John Yu ran Scenarios 108, 119, 120. Running others right now.
** John Yu ran Scenario 121. Running many others right now.
** GEOSYS running larger scenarios, finished Scenario 111 today (Mag 7.8)
** GEOSYS running larger scenarios, finished Scenario 111 today (Mag 7.8)
** HPCC running small/medium scenarios (max wall time is 2 weeks according to John)
** HPCC running small/medium scenarios (max wall time is 2 weeks according to John)
Line 14: Line 14:


* Fling Study
* Fling Study
** Continue to schedule Fling scenarios
** Continue to schedule Fling scenarios after 116 ends
** Move data and validate all completed scenarios
** Move data and validate all completed scenarios
* Follow-up with Rumi wrt her validation run results
* Follow-up with Rumi wrt her validation run results
** Why different number of stations produce different results
* Find a place in the BB src tree to put the plot files
* Find a place in the BB src tree to put the plot files


Line 24: Line 23:


== Followups: ==
== Followups: ==
* SDSU's result validation with Rumi
* Follow-up with Rumi to compare results from BBP and SDSU


== Ongoing: ==  
== Ongoing: ==  

Revision as of 17:12, 5 June 2012

Yesterday:

  • Fling Study
  • Investigated SDSU's validation run
    • Not able to reproduce Rumi's graph, need to follow up with her
    • Found out that BBToolbox generates different graphs depending on how many stations we have

Today:

  • Fling Study
    • Continue to schedule Fling scenarios after 116 ends
    • Move data and validate all completed scenarios
  • Follow-up with Rumi wrt her validation run results
  • Find a place in the BB src tree to put the plot files

Blocked:

  • No

Followups:

  • Follow-up with Rumi to compare results from BBP and SDSU

Ongoing:

  • Make trunk work both with and without site response
  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other