Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 6: Line 6:
** Running 118 and 124 on HPCC, using trunk and updated parallel scripts
** Running 118 and 124 on HPCC, using trunk and updated parallel scripts
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
* Finished running URS full validation test
* Trunk fails UCSB Loma Prieta full validation
** trunk and 11.2.3 results match on broadband.usc.edu
** This issue is documented in Trak issue #77
* Continued work on adapting run_bbp_parallel scripts to run Fling scenarios in 1 pass
** Running UCSB LP full validation with 11.2.3 to confirm results match
** Scenario 104 ran in 36 hours, (versus 60 hours previously).
** Still some room for improvement, by staging in data (maybe worth for longer scenarios)
* John Yu installed Cruise Control
* John Yu installed Cruise Control
* Met with Phil to talk about Broadband development
** Discussed recent progress and goals


== Today: ==
== Today: ==
Line 17: Line 17:
* Fling Study
* Fling Study
** Monitoring running scenarios
** Monitoring running scenarios
* Package new running scripts and check them into svn as part of BBP
* Package new parallel running scripts and check them into svn as part of BBP
* Continue working on the testing framework
* Fix Trak issue #77 (UCSB LP validation)
* Plan separation of GF, validation data, and velocity models
* Plan separation of GF, validation data, and velocity models
* Work on Cruise Control setup
* Work on Cruise Control setup
* BBP Science call


== Blocked: ==
== Blocked: ==
Line 26: Line 27:


== Followups: ==
== Followups: ==
* Meeting with Phil to talk about Broadband development priorities @ TBD
* Broadband tasks for next two weeks with Phil @ TBD
* Broadband Science call @ 2pm


== Ongoing: ==  
== Ongoing: ==  

Revision as of 16:43, 29 June 2012

Yesterday:

  • Fling Study
  • Trunk fails UCSB Loma Prieta full validation
    • This issue is documented in Trak issue #77
    • Running UCSB LP full validation with 11.2.3 to confirm results match
  • John Yu installed Cruise Control
  • Met with Phil to talk about Broadband development
    • Discussed recent progress and goals

Today:

  • Fling Study
    • Monitoring running scenarios
  • Package new parallel running scripts and check them into svn as part of BBP
  • Fix Trak issue #77 (UCSB LP validation)
  • Plan separation of GF, validation data, and velocity models
  • Work on Cruise Control setup
  • BBP Science call

Blocked:

  • No

Followups:

  • Broadband tasks for next two weeks with Phil @ TBD
  • Broadband Science call @ 2pm

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events and codebases from each other