Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 2: | Line 2: | ||
* Fling Study | * Fling Study | ||
** We are now | ** We are now 41/42 | ||
** Running 118 | ** Scenario 124 finished on Saturday, needs to be verified | ||
** | ** Running scenario 118 on HPCC, using trunk and updated parallel scripts | ||
** Scenario 118 is 210/241 stations, should finish on Wednesday | |||
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ||
* Trac issue #104: Environment variables select GF and validation: | * Fixed Trac issue #77 (UCSB LP validation) | ||
* Met with Phil, discussed design ideas and priorities for Broadband development | |||
* Broadband science call | |||
* Trac issue #104: Environment variables select GF and validation directories: done, testing | |||
* Trac issue #82: Separate validation code from Greens Functions: done, testing | * Trac issue #82: Separate validation code from Greens Functions: done, testing | ||
| Line 12: | Line 16: | ||
* Fling Study | * Fling Study | ||
** Monitoring running | ** Verify scenario 124, generate tar file, and post data | ||
** Monitoring last running scenario | |||
* Fix issue in GP code where filenames are cut short in site response module | |||
* Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP | * Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP | ||
* Trac #104: Write sample scripts | * Trac #104: Write sample scripts | ||
* Trac #82: Run more acceptance tests | * Trac #82: Run more acceptance tests | ||
* | * Trac #84: User selectable Greens Functions | ||
* Continue sketching BBP workflow (component by component with input and output files) | * Continue sketching BBP workflow (component by component with input and output files) | ||
* Trac issue #128: Start work on Cruise Control setup | * Trac issue #128: Start work on Cruise Control setup | ||
Revision as of 17:13, 9 July 2012
Yesterday:
- Fling Study
- We are now 41/42
- Scenario 124 finished on Saturday, needs to be verified
- Running scenario 118 on HPCC, using trunk and updated parallel scripts
- Scenario 118 is 210/241 stations, should finish on Wednesday
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Fixed Trac issue #77 (UCSB LP validation)
- Met with Phil, discussed design ideas and priorities for Broadband development
- Broadband science call
- Trac issue #104: Environment variables select GF and validation directories: done, testing
- Trac issue #82: Separate validation code from Greens Functions: done, testing
Today:
- Fling Study
- Verify scenario 124, generate tar file, and post data
- Monitoring last running scenario
- Fix issue in GP code where filenames are cut short in site response module
- Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP
- Trac #104: Write sample scripts
- Trac #82: Run more acceptance tests
- Trac #84: User selectable Greens Functions
- Continue sketching BBP workflow (component by component with input and output files)
- Trac issue #128: Start work on Cruise Control setup
Blocked:
- No
Followups:
- No
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events from each other