Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 2: | Line 2: | ||
* Trac #151: Removed hard-coded values from validation Python script | * Trac #151: Removed hard-coded values from validation Python script | ||
** | ** Finished testing, code is checked in | ||
* Created validation | ** Created validation event packages for Landers and Loma Prieta | ||
** Started testing all codebases | ** Started testing all codebases: UCSB finished and ok, others running | ||
* Created LOMAP GF package (only URS code, waiting for UCSB) | |||
* Broadband development meeting with Phil | * Broadband development meeting with Phil | ||
== Today: == | == Today: == | ||
* Trac # | * Trac #150: Include rupture generator in validation workflow | ||
* Create validation packages | |||
* Create | |||
* LOMAP Test run with new stations/src file | * LOMAP Test run with new stations/src file | ||
* Prepare HPCC 50-realization LOMAP | * Prepare HPCC 50-realization LOMAP script | ||
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP | * Trac #131: Package new parallel running scripts and check them into svn as part of BBP | ||
* Continue sketching BBP workflow (component by component with input and output files) | * Continue sketching BBP workflow (component by component with input and output files) | ||
| Line 23: | Line 22: | ||
== Followups: == | == Followups: == | ||
* | * SCEC call @ 11am | ||
Revision as of 17:00, 1 August 2012
Yesterday:
- Trac #151: Removed hard-coded values from validation Python script
- Finished testing, code is checked in
- Created validation event packages for Landers and Loma Prieta
- Started testing all codebases: UCSB finished and ok, others running
- Created LOMAP GF package (only URS code, waiting for UCSB)
- Broadband development meeting with Phil
Today:
- Trac #150: Include rupture generator in validation workflow
- Create validation packages
- LOMAP Test run with new stations/src file
- Prepare HPCC 50-realization LOMAP script
- Trac #131: Package new parallel running scripts and check them into svn as part of BBP
- Continue sketching BBP workflow (component by component with input and output files)
- Trac #128: Work on Cruise Control setup
Blocked:
- No
Followups:
- SCEC call @ 11am