Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* Trac #151: Removed hard-coded values from validation Python script
* Trac #150: Included rupture generator in validation workflow
** Finished testing, code is checked in
* Created validation packages
** Created validation event packages for Landers and Loma Prieta
* Ran LOMAP Test with new stations/src file
** Started testing all codebases: UCSB finished and ok, others running
* Broadband science call
* Created LOMAP GF package (only URS code, waiting for UCSB)
* Broadband development mtg with Phil
* Broadband development meeting with Phil
* Renamed all URS references to GP in the Broadband code


== Today: ==
== Today: ==


* Trac #150: Include rupture generator in validation workflow
* Trac #152: Rupture slip plot comes out distorted
* Create validation packages
* Look into LOMAP results from over the weekend (Fabio + Phil)
* LOMAP Test run with new stations/src file
* Look into HPCC 50-realization LOMAP script
* Prepare HPCC 50-realization LOMAP script
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
* Continue sketching BBP workflow (component by component with input and output files)
* Continue sketching BBP workflow (component by component with input and output files)
Line 22: Line 21:


== Followups: ==
== Followups: ==
* Cybershake call @ 11am
* No

Revision as of 16:59, 6 August 2012

Yesterday:

  • Trac #150: Included rupture generator in validation workflow
  • Created validation packages
  • Ran LOMAP Test with new stations/src file
  • Broadband science call
  • Broadband development mtg with Phil
  • Renamed all URS references to GP in the Broadband code

Today:

  • Trac #152: Rupture slip plot comes out distorted
  • Look into LOMAP results from over the weekend (Fabio + Phil)
  • Look into HPCC 50-realization LOMAP script
  • Trac #131: Package new parallel running scripts and check them into svn as part of BBP
  • Continue sketching BBP workflow (component by component with input and output files)
  • Trac #128: Work on Cruise Control setup

Blocked:

  • No

Followups:

  • No