Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* Trac #152: Fixed rupture slip plot
* All full validation test ran ok
* Ran all full validations using the updated GP trunk
* Checked in code and created new validation and velocity model packages
** Most already finished ok, waiting for a few more
* Met with Phil to discuss LOMAP results
* Broadband development meeting with Phil
** Running tests again to make sure we are getting good results
* Worked on sketching BBP workflow (genslip, jbsim, hfsim, wcc_siteamp)
* Fix for rupture slip plot breaks some acceptance tests
* Scheduled cal with Kim and Rumi to discuss BBToolbox updates


== Today: ==
== Today: ==


* Check all validation results
* Investigate rupture plot issue
* Check in updated code, create new validation and velocity model packages
* Look into LOMAP results from over the weekend (Fabio + Phil)
* Work on SCEC meeting abstract
* Work on SCEC meeting abstract
* Continue sketching BBP workflow (component by component with input and output files)
* Continue sketching BBP workflow (component by component with input and output files)
* Integrate SDSU code v1.4 into Broadband
* Look into HPCC 50-realization LOMAP script
* Look into HPCC 50-realization LOMAP script
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
* Integrate SDSU code v1.4 into Broadband (after call tomorrow)
* Trac #128: Work on Cruise Control setup
* Trac #128: Work on Cruise Control setup


Line 22: Line 23:


== Followups: ==
== Followups: ==
* Compare results with Phil @ TBD
* Cybershake call @ 11am

Revision as of 17:00, 8 August 2012

Yesterday:

  • All full validation test ran ok
  • Checked in code and created new validation and velocity model packages
  • Met with Phil to discuss LOMAP results
    • Running tests again to make sure we are getting good results
  • Worked on sketching BBP workflow (genslip, jbsim, hfsim, wcc_siteamp)
  • Fix for rupture slip plot breaks some acceptance tests
  • Scheduled cal with Kim and Rumi to discuss BBToolbox updates

Today:

  • Investigate rupture plot issue
  • Work on SCEC meeting abstract
  • Continue sketching BBP workflow (component by component with input and output files)
  • Look into HPCC 50-realization LOMAP script
  • Trac #131: Package new parallel running scripts and check them into svn as part of BBP
  • Integrate SDSU code v1.4 into Broadband (after call tomorrow)
  • Trac #128: Work on Cruise Control setup

Blocked:

  • No

Followups:

  • Cybershake call @ 11am