Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* Sent e-mail to RA and JC with rupture plots for LOMAP and asking about missing parameters
* Worked on implementing the correct_rotd50 module
* Talked to JY, and got matplotlib updated on HPCC
* Compared fling results from new trunk to what we got in June --> Checks out fine.
* GOF unit test passes on HPCC
* Set up trunk on HPCC
* Updated batching scripts for using the new trunk
* Updated batching scripts for using the new trunk
** Ran Fling scenario 101


== Today: ==
== Today: ==


* Finish correct_rotd50 module, write test case
* Work on generating Arias duration plot
* Work on generating Arias duration plot
* Check batching scripts into svn (Trac #131)
* Check batching scripts into svn (Trac #131)
* Follow-up with RG, RA, JC regarding needed parameters for LOMAP
* Write script to run LOMAP full validation on HPCC
* Write script to run LOMAP full validation on HPCC


Line 18: Line 17:


== Followups: ==
== Followups: ==
* No
* Broadband meeting with Phil @ TBD
* Broadband science call @ 2pm

Revision as of 17:17, 31 August 2012

Yesterday:

  • Worked on implementing the correct_rotd50 module
  • Compared fling results from new trunk to what we got in June --> Checks out fine.
  • Updated batching scripts for using the new trunk

Today:

  • Finish correct_rotd50 module, write test case
  • Work on generating Arias duration plot
  • Check batching scripts into svn (Trac #131)
  • Follow-up with RG, RA, JC regarding needed parameters for LOMAP
  • Write script to run LOMAP full validation on HPCC

Blocked:

  • No

Followups:

  • Broadband meeting with Phil @ TBD
  • Broadband science call @ 2pm