Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Finished correct_rotd50 module, tested ok | ||
* | * Changed workflow generator so that it works with and without the site correction | ||
* | * Ran full validations for LP,LA,NR using UCSB code | ||
** Fixed minor issues | |||
* Checked batch utils into SVN | |||
* Broadband science call | |||
* Broadband meeting with Phil | |||
== Today: == | == Today: == | ||
* | * Create updated validation packages for all events | ||
** Add UCSB LOMAP files for test run | |||
* Start SCEC meeting poster | |||
* Look into new BBToolBox | |||
* Work on generating Arias duration plot | * Work on generating Arias duration plot | ||
* Write script to run LOMAP full validation on HPCC | * Write script to run LOMAP full validation on HPCC | ||
| Line 17: | Line 22: | ||
== Followups: == | == Followups: == | ||
* | * No | ||
Revision as of 17:07, 4 September 2012
Yesterday:
- Finished correct_rotd50 module, tested ok
- Changed workflow generator so that it works with and without the site correction
- Ran full validations for LP,LA,NR using UCSB code
- Fixed minor issues
- Checked batch utils into SVN
- Broadband science call
- Broadband meeting with Phil
Today:
- Create updated validation packages for all events
- Add UCSB LOMAP files for test run
- Start SCEC meeting poster
- Look into new BBToolBox
- Work on generating Arias duration plot
- Write script to run LOMAP full validation on HPCC
Blocked:
- No
Followups:
- No