Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 2: Line 2:


* Tested Arias Duration implementation
* Tested Arias Duration implementation
* Exchanged e-mails with RG
* Ran jbsim with different simulation windows
* Ran jbsim with different simulation windows
** Two parameters involved: ntout and maxnt
** Two parameters involved: ntout and maxnt

Revision as of 17:05, 20 September 2012

Yesterday:

  • Tested Arias Duration implementation
  • Exchanged e-mails with RG
  • Ran jbsim with different simulation windows
    • Two parameters involved: ntout and maxnt
  • Compiled Norm's faster RotD50 code
  • Call with RK, PM
  • Ran LOMAP GP code

Today:

  • Test new version of RotD50 code
    • LOMAP GP and UCSB
  • Work on BBToolbox integration
  • Broadband science call

Blocked:

  • No

Followups:

  • Broadband science call @ 1pm