Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* Tested | * Tested new version of RotD50 code in the platform | ||
* | ** Few changes to the Fortran code | ||
* Ran | * Ran LOMAP GP and UCSB | ||
** | ** Results look fine with new RotD50 | ||
* | * Checked everything into svn | ||
* Call with | * Broadband science call | ||
* | * Ran 50-realization LOMAP GP on HPCC | ||
* Call with CG, what else is needed to finalize pipeline | |||
** Band-pass filter for bias plot | |||
** Another bias plot with station distance | |||
== Today: == | == Today: == | ||
* | * Run 1-station 8.2 fling | ||
** | ** 100s window size | ||
* | ** 150s window size | ||
* Post 50-realization results | |||
* BBToolbox integration | |||
== Blocked: == | == Blocked: == | ||
| Line 20: | Line 24: | ||
== Followups: == | == Followups: == | ||
* | * No | ||
Revision as of 16:47, 21 September 2012
Yesterday:
- Tested new version of RotD50 code in the platform
- Few changes to the Fortran code
- Ran LOMAP GP and UCSB
- Results look fine with new RotD50
- Checked everything into svn
- Broadband science call
- Ran 50-realization LOMAP GP on HPCC
- Call with CG, what else is needed to finalize pipeline
- Band-pass filter for bias plot
- Another bias plot with station distance
Today:
- Run 1-station 8.2 fling
- 100s window size
- 150s window size
- Post 50-realization results
- BBToolbox integration
Blocked:
- No
Followups:
- No