Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 3: Line 3:
* Updated links on broadband wiki to backed-up location
* Updated links on broadband wiki to backed-up location
* Collected papers for LS
* Collected papers for LS
* Meeting with DG, JM
* DHS proposal to DS


== Today: ==
== Today: ==
* PRAC Annual report due Friday
* Install bbp rc on cluster and try job submission scripts
* Install bbp rc on cluster and try job submission scripts
* PRAC Annual report due Friday
* Send CS papers to LS
* Send CS papers to LS
* BBP data products summary
* BBP data products summary

Revision as of 17:00, 26 September 2012

Yesterday:

  • BBP modeler acct list to JY
  • Updated links on broadband wiki to backed-up location
  • Collected papers for LS
  • Meeting with DG, JM
  • DHS proposal to DS

Today:

  • PRAC Annual report due Friday
  • Install bbp rc on cluster and try job submission scripts
  • Send CS papers to LS
  • BBP data products summary

Blocked:

  • INCITE Quarterly report due Friday waiting on inputs from GE

Followups:

  • No

Pending:

  • No