Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 2: Line 2:


* Worked on ExSim integration
* Worked on ExSim integration
** Checked ExSim into SVN
** Got reply from KA about parameters, made few adjustments
** Migrated converter.for program to Python
** Write complete ExSim parameter file
** Worked on script to write ExSim's configuration file
** Invokes ExSim
* Got North Palm Springs, Tottori, and Niigata event files from CG
** Looks at results
* Matlab is working again
** Modified ExSim's frequencies to match the 63 periods expected in the platform


== Today: ==
== Today: ==


* Continue ExSim integration
* Continue ExSim integration
** Start ExSim, reformat output files
** Reformat output files into RotD50 files
** Create XML file to run ExSim within the Platform
** Create XML file to run ExSim within the Platform
** Still waiting for KA's reply
* Check into svn GMPE code
* Check into svn GMPE code
* Create North Palm Springs Validation package


== Blocked: ==
== Blocked: ==
Line 20: Line 20:


== Followups: ==
== Followups: ==
* No
* Cybershake call @ 11am

Revision as of 17:57, 6 February 2013

Yesterday:

  • Worked on ExSim integration
    • Got reply from KA about parameters, made few adjustments
    • Write complete ExSim parameter file
    • Invokes ExSim
    • Looks at results
    • Modified ExSim's frequencies to match the 63 periods expected in the platform

Today:

  • Continue ExSim integration
    • Reformat output files into RotD50 files
    • Create XML file to run ExSim within the Platform
  • Check into svn GMPE code
  • Create North Palm Springs Validation package

Blocked:

  • No

Followups:

  • Cybershake call @ 11am