Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 2: | Line 2: | ||
* Worked on ExSim integration | * Worked on ExSim integration | ||
** | ** Got reply from KA about parameters, made few adjustments | ||
** | ** Write complete ExSim parameter file | ||
** | ** Invokes ExSim | ||
* | ** Looks at results | ||
* | ** Modified ExSim's frequencies to match the 63 periods expected in the platform | ||
== Today: == | == Today: == | ||
* Continue ExSim integration | * Continue ExSim integration | ||
** | ** Reformat output files into RotD50 files | ||
** Create XML file to run ExSim within the Platform | ** Create XML file to run ExSim within the Platform | ||
* Check into svn GMPE code | * Check into svn GMPE code | ||
* Create North Palm Springs Validation package | |||
== Blocked: == | == Blocked: == | ||
| Line 20: | Line 20: | ||
== Followups: == | == Followups: == | ||
* | * Cybershake call @ 11am | ||
Revision as of 17:57, 6 February 2013
Yesterday:
- Worked on ExSim integration
- Got reply from KA about parameters, made few adjustments
- Write complete ExSim parameter file
- Invokes ExSim
- Looks at results
- Modified ExSim's frequencies to match the 63 periods expected in the platform
Today:
- Continue ExSim integration
- Reformat output files into RotD50 files
- Create XML file to run ExSim within the Platform
- Check into svn GMPE code
- Create North Palm Springs Validation package
Blocked:
- No
Followups:
- Cybershake call @ 11am