Staff Priorities - David: Difference between revisions
From SCECpedia
Jump to navigationJump to search
| Line 11: | Line 11: | ||
== Today: == | == Today: == | ||
- | - Continue with CVM Eval<br /> | ||
- | - AWP simulation<br /> | ||
- | - Verify mesh somehow? | ||
- | - Number of points seems correct | ||
- | - Production run monitoring<br /> | ||
- | - CVM Wiki entries, which systems we've run on<br /> | ||
- | - Further CVM-SI work?<br /> | ||
- ShakeOut work for Central U.S.<br /> | |||
== Blocked: == | == Blocked: == | ||
Revision as of 17:25, 7 February 2013
Yesterday:
- CVM Eval first component running
- CVM2Mesh Successful
- Production run monitoring
- Review CVM-SI code and trilinear interpolation
- CVM-SI call
- CyberShake call
- ShakeOut work for Central U.S.
Today:
- Continue with CVM Eval
- AWP simulation
- Verify mesh somehow?
- Number of points seems correct
- Production run monitoring
- CVM Wiki entries, which systems we've run on
- Further CVM-SI work?
- ShakeOut work for Central U.S.
Blocked:
- No
Followups:
- None
Contribution Summary
- New release of CVM-H - helped with version, modding files, etc.
- Generate MMI information for Maren
- Learned quite a bit about UCVM code base
- Wrote description of configurable parameters for the UCVM etree mesh extraction process
- CyberShake Monitoring