Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 3: Line 3:
* Work with David on SI20
* Work with David on SI20
* Call with Masha on CSEP status
* Call with Masha on CSEP status
* Started on INCITE Q4 report
* Talk with Nolan on File metadata
* BBP Call with group


== Today: ==
== Today: ==
* Call with Nico and Sanaz
* Call with Nico and Sanaz 11am
* Call with Jessica on CS db
* Call with Jessica on CS db 12pm
* SEISM coordination call
* Email to TACC for unpurged space
* Email to TACC for unpurged space
* Write our INCITE Q4 report
* Completed draft of INCITE Q4 report
* Geoinformatics schedule of topics for calls
* Geoinformatics schedule of topics for calls
* Complete adding new users to all systems
* Complete adding new users to all systems
Line 22: Line 26:
* SHACC 3 meeting
* SHACC 3 meeting
* Ask when UCERF3 will be ready for CSEP
* Ask when UCERF3 will be ready for CSEP
* Discuss Arias Duration
* Discuss Arias Duration on bbp
* Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0
* Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0

Revision as of 18:14, 25 February 2013

Yesterday:

  • Calls with Nico and Sanaz
  • Work with David on SI20
  • Call with Masha on CSEP status
  • Started on INCITE Q4 report
  • Talk with Nolan on File metadata
  • BBP Call with group

Today:

  • Call with Nico and Sanaz 11am
  • Call with Jessica on CS db 12pm
  • SEISM coordination call
  • Email to TACC for unpurged space
  • Completed draft of INCITE Q4 report
  • Geoinformatics schedule of topics for calls
  • Complete adding new users to all systems

Blocked:

  • No

Followups:

  • No

Pending:

  • UCERF3.0 on Stampede plans
  • SHACC 3 meeting
  • Ask when UCERF3 will be ready for CSEP
  • Discuss Arias Duration on bbp
  • Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0