Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* Calls with Nico and Sanaz
* Call with TACC
* Work with David on SI20
* INCITE report Q4 report
* Call with Masha on CSEP status
* Prepared EEW update
* Started on INCITE Q4 report
* Talk with Nolan on File metadata
* BBP Call with group


== Today: ==
== Today: ==
* Call with Nico and Sanaz 11am
* Send EEW update
* Call with Jessica on CS db 12pm
* Circulate draft of INCITE Q4 report
* ETAS seminar 3:30pm
* Send SEISM call planning email
* SEISM call planning email - schedule High-F topics
* Email to TACC for unpurged space
* Email to TACC for unpurged space
* Completed draft of INCITE Q4 report
* Email to Blue Waters about Grid-job submission
* Geoinformatics schedule of topics for calls
* Prepare metrics report for Call tomorrow
* Complete adding new users to all systems


== Blocked: ==
== Blocked: ==
Line 24: Line 19:


== Pending: ==
== Pending: ==
* Geoinformatics schedule of topics for calls
* Complete adding new users to all systems
* UCERF3.0 on Stampede plans
* UCERF3.0 on Stampede plans
* SHACC 3 meeting
* SHACC 3 meeting

Revision as of 18:11, 27 February 2013

Yesterday:

  • Call with TACC
  • INCITE report Q4 report
  • Prepared EEW update

Today:

  • Send EEW update
  • Circulate draft of INCITE Q4 report
  • Send SEISM call planning email
  • Email to TACC for unpurged space
  • Email to Blue Waters about Grid-job submission
  • Prepare metrics report for Call tomorrow

Blocked:

  • No

Followups:

  • No

Pending:

  • Geoinformatics schedule of topics for calls
  • Complete adding new users to all systems
  • UCERF3.0 on Stampede plans
  • SHACC 3 meeting
  • Ask when UCERF3 will be ready for CSEP
  • Discuss Arias Duration on bbp
  • Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0