Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Blue Waters:
*Blue Waters:
**Continued testing workflow-generating scripts
**Resolve velocity model issues, passed validation
*Stampede:
*Stampede:
**Ran tests, issue continues with stage-out of job status
**Investigated issues behind stage-out of job status:  looks like scontrol stops being called
**Tried test with slurm2, same problem
**Found typo in logging
*Kraken:
*Kraken:
**Continued configuring forward simulation
**Queued up forward simulation
**Ran post-processing for BW AWP WNGC SGTs (again) -- didn't match, velocity model issues
*Started putting Blue Waters information on internal wiki


== Today ==
== Today ==
*Blue Waters:
*Blue Waters:
**Resolve velocity model issues.
**Continue working through workflow creator
**WF description for GRAM request
*Stampede:
*Stampede:
**Investigate issues behind stage-out of job status
**Continue investigating GRAM issues
*Kraken:
*Kraken:
**Continue configuring forward simulation
**Monitor forward simulation
*Put Blue Waters #s on wiki
*Finish putting Blue Waters information on internal wiki
*Wiki entries for Blue Waters and Stampede validation
*Wiki entries for Blue Waters and Stampede validation


Line 23: Line 24:


== Follow-ups ==  
== Follow-ups ==  
*Geoinformatics call at 11
*CyberShake calls
*Phil at 1:30 PST


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 18:14, 6 March 2013

Yesterday

  • Blue Waters:
    • Resolve velocity model issues, passed validation
  • Stampede:
    • Investigated issues behind stage-out of job status: looks like scontrol stops being called
    • Tried test with slurm2, same problem
    • Found typo in logging
  • Kraken:
    • Queued up forward simulation
  • Started putting Blue Waters information on internal wiki

Today

  • Blue Waters:
    • Continue working through workflow creator
  • Stampede:
    • Continue investigating GRAM issues
  • Kraken:
    • Monitor forward simulation
  • Finish putting Blue Waters information on internal wiki
  • Wiki entries for Blue Waters and Stampede validation

Blocked

  • No

Follow-ups

  • CyberShake calls

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration