Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* Continued looking into ExSim's issues
* Updated some trac tickets
** KA's run took 10 minutes and completed successfully
* ExSim
** Got confirmation of files to use for Whittier Narrows and Northridge
** Set up LABasin region to run ExSIM simulations
* Completed workflow generator code
** Generated plots for Northridge and Whittier Narrows
** Now needs testing
** Sent results to KA and CG
* Ran 200s Tottori run, started 120s run
** Could not find any real problems in KA's runs
* Got Mojave GFs from RG
** LOMAP: 10m, Northridge: 5m, Whittier Narrows: 2m
** Sent follow-up message about parameters used in GP method
* Tested workflow generator
* Updated gmpe comparison scripts to work with ExSIM
* Completed Tottori 120s and 200s runs
** Basically take the same time


== Today: ==
== Today: ==


* Update tickets
* Send e-mail to RG about simulation time
* ExSim
* Continue testing workflow generator
** Set up LABasin region for ExSim method
** Reply to KA about his runs
* Finish 120s Tottori run and compare results
* Test workflow generator
* Trim acceptance tests
* Trim acceptance tests
** from 99 --> about 10
** from 99 --> about 10
* Modify cluster scripts to match updated workflow generator


== Blocked: ==
== Blocked: ==
Line 25: Line 25:


== Followups: ==
== Followups: ==
* Cybershake calls @ 11am
* No

Revision as of 18:08, 7 March 2013

Yesterday:

  • Updated some trac tickets
  • ExSim
    • Set up LABasin region to run ExSIM simulations
    • Generated plots for Northridge and Whittier Narrows
    • Sent results to KA and CG
    • Could not find any real problems in KA's runs
    • LOMAP: 10m, Northridge: 5m, Whittier Narrows: 2m
  • Tested workflow generator
  • Updated gmpe comparison scripts to work with ExSIM
  • Completed Tottori 120s and 200s runs
    • Basically take the same time

Today:

  • Send e-mail to RG about simulation time
  • Continue testing workflow generator
  • Trim acceptance tests
    • from 99 --> about 10
  • Modify cluster scripts to match updated workflow generator

Blocked:

  • No

Followups:

  • No